InterConnecting Gas Pipeline with the New Unit (E1) at West Cairo Power Plant

Design of more than 150m of Steel Structure

IHCG provides the design of 150m length of Steel Structure of 2 Gas Pipe Lines (16” & 24”), along with the Cable Tray and all Civil Works. The project consists of Designing Steel Supports of 150m of 2 Gas Pipe Lines (16” & 24”).

The Steel Structure consists of supports and a bridge with span of (+16.00m) and (+6.00m) height.

The main challenge was to avoid the existing infrastructure networks of High Voltage Electrical Line, High Pressure Pipe Gas Network, and Sewage Network.

In Association with:
GASCO
PEGSCO

Owner
West Cairo Electricity Co.

Client
Town Gas Co.
Location
Western Cairo, Egypt
Stages
Preliminary Design Detailed Design
Services
Structural Steel Design
Civil Works
Construction Supervision